BS EN 12350-1 PDF

BS Part BS Part BS EN to 3 & 5 to 7: BS EN BS EN to BS EN Specifies two procedures for sampling fresh concrete: composite and spot sampling. Document History. Supersedes BS EN Related products by. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll .

Author: Dagar Mazugul
Country: Lebanon
Language: English (Spanish)
Genre: Career
Published (Last): 22 August 2008
Pages: 237
PDF File Size: 17.36 Mb
ePub File Size: 3.31 Mb
ISBN: 307-5-56811-401-3
Downloads: 56563
Price: Free* [*Free Regsitration Required]
Uploader: Muzilkree

It depends upon the project specifications on particular project area of jurisdiction. Leave a Reply Cancel reply Enter your comment here Gently press the concrete around the TMD at the surface of concrete so bs en 12350-1 the ambient temperature does not influence the reading.

Concrete cubes at the site Marking The test specimens shall be marked clearly and indelibly, without damaging the specimen using a cub tag that contains bs en 12350-1 information related to the specimen Casting date, ticket number, specimen ID, location of sampling….

Bs en 12350-1 in your details below or click an icon to log in: Mechanical vibration with vibrating table Apply bd vibration for the minimum duration necessary to achieve full compaction of the concrete.

BS EN 12350-1/BS EN 12350-2/BS EN 12390-2/BS EN 12390-2

Protect the sample from the sun, wind, and other sources of rapid evaporation, and from contamination. Procedure for Slump Test. Rod each layer 25 times using the rounded end of the tamping rod. This British Standard specifies two procedures for sampling fresh bs en 12350-1 which are implemented by ej sampling and by spot sampling.

Related Posts  BLESS THE LORD MY SOUL TAIZE EPUB

BS EN – Testing fresh concrete. Sampling – BSI British Standards

Rod the bottom layer throughout its bs en 12350-1. Find Similar Items This product falls into the following categories. The vertical distance between the height of the mould and the highest point is measured and recorded as the slump in mm. The most common method used in the sampling for casting with large volume of concrete is the spot sampling which bs en 12350-1 less time intensive due to the rate of pouring. Please download Chrome or Firefox or view our browser tips.

BS EN 12350-1:2009

Compacting by hand with compacting rod or bar Distribute the strokes in a uniform manner over the cross-section of the mould. This site uses cookies. Apparatus Mold Mold use for slump test of fresh concrete Dimension bs en 12350-1 mm Metallic, Frustum of a cone Alternative materials bss allowed if requirements are met comparability tests Tamping Rod Round, straight steel rod, length mm and diameter 16mm Tamping end rounded to a hemispherical tip Measuring Device Ruler Marked in increments of 5 mm or smaller Length of at least mm In addition, a scoop is needed.

This will cause the delay of pouring and worst the rejection of other concrete truck loads because of the temperature overdue.

Fill the mold in three bs en 12350-1 of approximately equal height.

Sampling of Freshly Mixed Concrete at the Field (BS EN ) – QA/QC Construction

A sample of concrete is placed in a mold, shaped as the frustum of a cone, and compacted. You may find similar bs en 12350-1 within these categories by selecting from the choices below:. Each sample shall be accompanied by a report from the person responsible for taking the sample.

Related Posts  SHELDA DEBOWSKI KNOWLEDGE MANAGEMENT DOWNLOAD

Sampling Concrete It is acceptable to measure the temperature in: Frequency shall be at least vibrations per minute The diameter of the internal bs en 12350-1 not exceeding one-quarter of the smallest dimension of the test specimen Vibrating table with a minimum frequency of 40 Hz 2 bs en 12350-1 per minute Compacting rod or bar Preparation and filling of the moulds Before filling the mould, cover the inner surface of the mould with a thin film non-reactive release material to prevent the concrete from adhering to the mould.

You are commenting using your WordPress. Plastic concrete slump greater than 10 mm and less than mm. Menu Home Blog About Contact.

Disregard the first part and the last part of the load and take at least 4 increments. Email required Address never made public.

Accept and continue Learn more about the bs en 12350-1 we use and how to change your settings. Difference of the two samplings — Composite sampling is more diverse bs en 12350-1 it is the representative of the whole truck load. What is the time limit before placing of fresh concrete?

Scoopfuls are taken from four different parts of the load to form the standard sample. Report from the sample includes: As the load is discharged, sampling should be taken from the whole bs en 12350-1 and depth not just the top part.